EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
HMCRV12
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (106)
Research
Workshop
- (5)
-
More exciting photos...
-
Last Day! Fall 2022
-
Riveting is riveting!
-
Build Update!
-
First Aerolab of...
Empennage
- (6)
-
Progress Journal...
-
Empennage Complete
-
Empennage tip fairings
-
Building the Servo
-
Clevis alignment
-
Fitting the...
Fuselage
- (16)
-
Hinges for lower cowl
-
Roll Bar
-
Assembled rear bulkhead
-
F1202 B firewall...
-
Attaching the rollbar
-
canopy rib
-
flap crank
-
roll bar
-
Sealing the Deal...
-
2/8/23 Assorted...
-
First day working...
-
Working on the...
-
Fuselage update
-
Fuselage Updates
Firewall
Tail Feathers
Wings
- (22)
-
Ready for flight?
-
Flaperon pushrod
-
Riveting Stiffening...
-
Pushrod to actuator...
-
Riviting wing tips...
-
Wing Fairing Electrical
-
Electrical Work on...
-
Positional Lights...
-
Wing lights
-
Wing tip
-
Wing Lights
-
Riveting the skins...
-
Wing Light Installation
-
Wing skins
-
Wing Tips
-
Bending tabs on wing...
-
Priming and sealing...
-
Inspecting wing ribs
-
Riveting the wings
-
Attaching Wig Skins...
-
Left Wing Riveting...
-
First Build Day:...
Controls
- (1)
-
control stick rod
Avionics
Lighting
- (1)
-
Light covers
Instrument Panel
Landing Gear
- (2)
-
Baby's first steps!
-
Greasing parts
Engine
- (1)
-
Engine mount
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (1)
-
Gluing felt into the...
Tailcone
- (14)
-
Tailcone Assembly
-
Riveting install...
-
Riveting skins to...
-
Attaching skin,...
-
Installing the...
-
Tailcone fuselage...
-
Constructing...
-
Assembling tailcone
-
Match drilling...
-
Assembling Tailcone...
-
Deburring Tailpieces
-
Fabricating the skid...
-
Fluting tailcone ribs
-
Breaking edges of...
Stabilator
- (14)
-
Stabilator Fairings
-
Stabilator Assembly
-
Riveting skins to...
-
Stabilator-- mass...
-
Stabilator skins
-
Stabilator Ribs
-
aft spar for stabilator
-
Fore spar for...
-
Assembling spar cap...
-
Attatching spar caps...
-
Assembling the spar...
-
Hinge Angle and Horn...
-
Hinge Angle...
Rudder
- (8)
-
Post Hanger Trip
-
Frontal landing gear...
-
Flap crank assembly
-
Vans RV-7 Rudder
-
Affixing Rudder Skin
-
Riveting the rudder
-
Rudder Spar Assembly
-
Final Drilling and...
V Stabilizer
- (9)
-
Stripped Bolt...
-
Vertical Stabilizer...
-
Prepping and...
-
Riveting spar caps...
-
Assembling ribs for...
-
Assembling vertical...
-
Preparing the spar...
-
Assembling Spar Cap...
-
Hinge Bracket and...
AntiServoTab
- (4)
-
Match Drilling Piano...
-
Riveting Anti-Servio...
-
Riveting Anti-Servo...
-
Preparing AST Skin
DrillBitHold
- (2)
-
Drill bit holder...
-
Bit Holder
Builder Name:
David Harris
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
235.5
Total Flight Time:
0.3
Total Expense:
N/A
Start/Last Date:
Aug 25, 2021 - No Finish Date
Engine:
Rotax 912is
Propeller:
Sensenich Ground Adjustable Composite
Friendly URL:
https://eaabuilderslog.org?s=HMCRV12
Home or Last Project Picture
Sep 15, 2021
Assembling Spar Cap for Vertical Stabilizer
- (3 hours)
Category: V Stabilizer
First, drilling holes in spar. Then, using these holes, riveting spar caps to the spar for the rudder
IMG_6572.jpg
IMG_6594.jpg
IMG_6596.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.